Electric Bus (e-bus) Demonstration Project Detailed Planning and Design Study for Cairo Transport Authority (CTA)
World Bank-financed contract awarded to SETEC for the Egypt, Arab Republic of Greater Cairo Air Pollution Management and Climate Change Project project (Project ID P172548).
Overview
Contract awarded under World Bank-financed project P172548 (Greater Cairo Air Pollution Management and Climate Change Project). Borrower: Government of Egypt, Arab Republic of. Procurement category: Consultant Services. Method: Quality And Cost-Based Selection. Review type: Prior. Fiscal year: 2023. Supplier of record (per World Bank STEP): SETEC (France). Borrower contract ref: EG-EEAA-252242-CS-QCBS. Source: World Bank Contract Awards in Investment Project Financing dataset, daily updated from STEP.
Selection Criteria
Selected through Quality And Cost-Based Selection procurement procedure under World Bank Procurement Regulations. Procurement category: Consultant Services. Subject to Prior review by the World Bank.