Skip to the main content
CONTRACT AWARDUpdated 15 days ago

Grid Stability Studies for the proposed 40 MW Rental Solar Generation Plant adjacent to the Kamakwe Substation on the CLSG Line.

World Bank-financed contract awarded to TETRA TECH ES INC. for the Sierra Leone Enhancing Sierra Leone Energy Access project (Project ID P171059).

English, French, Portuguese or Arabic, machine translated, with the original kept beside it.
Key Information
Awarded by
Government of Sierra Leone (World Bank-financed, project P171059)
Location
Sierra Leone, Sierra Leone
Status
Awarded
Category
Consultant Services
Award Amount
USD 94,401
Size
small
Reference
1877088
Procurement Method
Direct Selection
Language
en
Awarded to
TETRA TECH ES INC.

Overview

Contract awarded under World Bank-financed project P171059 (Enhancing Sierra Leone Energy Access). Borrower: Government of Sierra Leone. Procurement category: Consultant Services. Method: Direct Selection. Review type: Post. Fiscal year: 2026. Supplier of record (per World Bank STEP): TETRA TECH ES INC. (United States). Borrower contract ref: SL-EDSA-521283-CS-CDS. Source: World Bank Contract Awards in Investment Project Financing dataset, daily updated from STEP.

Selection Criteria

Selected through Direct Selection procurement procedure under World Bank Procurement Regulations. Procurement category: Consultant Services. Subject to Post review by the World Bank.

Source: World Bank Contract Awards Dataset (DS00005), Project P171059 - Enhancing Sierra Leone Energy Access