Supply of Bailey Bridges for Emergency Interventions at Luhombero Bridge (61.542 m) in Ulanga DC, Mbasa Bridge (42.672m) in Kilombero DC, Mbasa Bridge (42.672m) in Mlimba DC , Ng’uni bridge (30.48m)
World Bank-financed contract awarded to ZHENJIANG GREAT WALL HEAVY INDUSTRY TECHNOLOGY CO for the Tanzania DAR ES SALAAM METROPOLITAN DEVELOPMENT PROJECT PHASE 2 project (Project ID P180298).
English, French, Portuguese or Arabic, machine translated, with the original kept beside it.
Overview
Contract awarded under World Bank-financed project P180298 (DAR ES SALAAM METROPOLITAN DEVELOPMENT PROJECT PHASE 2). Borrower: Government of Tanzania. Procurement category: Goods. Method: Request for Bids. Review type: Prior. Fiscal year: 2026. Supplier of record (per World Bank STEP): ZHENJIANG GREAT WALL HEAVY INDUSTRY TECHNOLOGY CO (China). Borrower contract ref: TZ-PO-RALG-501570-GO-RFB. Source: World Bank Contract Awards in Investment Project Financing dataset, daily updated from STEP.
Selection Criteria
Selected through Request for Bids procurement procedure under World Bank Procurement Regulations. Procurement category: Goods. Subject to Prior review by the World Bank.