Skip to the main content
TENDERUpdated 6 days ago

Construction of Flood Control Structures in Bor South and Twic East County in Jonglei State (93km Dykes)

Ministry of Water Resources and Irrigations has issued a tender for construction of Flood Control Structures in Bor South and Twic East County in Jonglei State (93km Dykes). It is published as a invitation for bids under the request for bids method. It applies to Eastern and Southern Africa. It was published on 2026-10-15 and closes on 2026-11-27. The reference is SS-MWRI-568546-CW-RFB. The notice was published by World Bank.

English, French, Portuguese or Arabic, machine translated, with the original kept beside it.
Key Information
Buyer
Ministry of Water Resources and Irrigations
Location
Eastern and Southern Africa
Status
Open
Deadline
Nov 27, 2026
Category
Invitation for Bids
Reference
SS-MWRI-568546-CW-RFB
Method
Request for Bids
Language
English
Read the noticeWe hold no submission or application link for this call, so this opens the published notice
Assess my chancesABA'AI reads this notice, then asks you only what we do not already hold
Keeps its status, your notes and a checklist on your tracker, and it can be shared with the people bidding with you.
Keeps it on your saved list, and its closing date on your deadline calendar. No status, no checklist and nobody else sees it.

Scope of Work

2. The Ministry of Water Resources and Irrigation (MWRI) now invites sealed Bids from eligible Bidders for Construction of Flood Control Structures in Bor South and Twic East Counties in Jonglei State including an earth fill dyke of 94km and four retention ponds covering Lot 1- Flood Protection Dyke Works , Section 1 (Bor area): approx. Ch. 0+000 to Ch. 31+300 (≈ 31.3 km), including associated crossing/drainage structures and retention ponds; Lot 2 -Flood Protection Dyke Works , Section 2 (Jalle area): approx. Ch. 31+300 to Ch. 62+600 (≈ 31.3 km), including associated crossing/drainage structures and retention ponds; and Lot 3- Flood Protection Dyke Works , Section 3 (Panyagor area): approx. Ch. 62+600 to Ch. 94+000 (≈ 31.4 km), including associated crossing/drainage structures. The works are characterized by significant earth movement i.e excavation, transport, layering and compactions, construction of localized hydraulic structures with and without hydromechanical control to protect the Bor /Jalle/Panyagor areas in Jonglei state in South Sudan

Original Procurement Notice

Read the notice as World Bank published ithttps://projects.worldbank.org/en/projects-operations/procurement-detail/OP00475115

Contact

NameAndrew Yunda