Skip to the main content
CONTRACT AWARDUpdated today

Oye Irrigation Project

BENIN/ OWENA RBDA awarded a contract to Sledge Consulting Ltd for Oye Irrigation Project. The procurement method is national competitive bidding. The contract value is NGN 18,192,560. It was published on 3 May 2021. The reference is ocds-gyl66f-252038001-000274#award-1676. The notice was published by Nigeria Bureau of Public Procurement, NOCOPO.

French, Portuguese or Arabic, machine translated, with the original kept beside it.
Key Information
Location
Nigeria
Status
Awarded
Award Amount
NGN 18,192,560
Reference
ocds-gyl66f-252038001-000274#award-1676
Procurement Method
National Competitive Bidding
Language
English
Awarded to
Sledge Consulting Ltd
Bidders
3

Scope of Work

  • Excavate any material except rock haul excavated materials to any distance, deposit, spread in 150mm layers, and compact to 100% B.S compaction as filling for embarkment and margins, shape formation and trim slopes to required cross-section, all measured as completed work in place. (quantity 5400)
  • Provide , place and compact concrete grade 20 base and walls of drain.rials to any distance, deposit, spread in 150mm layers, and compact to 100% B.S compaction as filling for embarkment and margins, shape formation and trim slopes to required cross-section, all measured as completed work in place. (quantity 270)
  • Provide, spread, shape and compact to 100% West African Compaction as subbase course 150mm thick to road carriageway and shoulders as directed.d walls of drain.rials to any distance, deposit, spread in 150mm layers, and compact to 100% B.S compaction as filling for embarkment and margins, shape formation and trim slopes to required cross-section, all measured as completed work in place. (quantity 1800)

Selection Criteria

ratedCriteria: Evidence of BPP Certificate of Compliance

Similar contract awards

See all