Construction of Kerouane 225/30 kV Substation, PIEGM
Engineering, supply and construction of the Kerouane 225/30 kV substation under the Guinea-Mali Electricity Interconnection Project (PIEGM), financed by IDA credits 62610 and D3360.
View Original Announcement
Opens on the original publisher's site
Description
Works contract under the Guinea-Mali Interconnection Project (P166042). Scope covers design, supply and installation of high-voltage equipment including a 225/30 kV transformer, switchgear, control and protection systems, and commissioning of the Kerouane substation. Initial contract value USD 10,560,000.00, with a price adjustment of USD 4,658,983.59 representing 44.11 percent of the initial contract. As of 30 September 2024 the work progress stood at 65.39 percent. The main equipment of the substation, including the transformer, was already delivered on site in March 2023. Completion of works is scheduled for 28 February 2025. Contractor name not disclosed in the public Implementation Status Report.
Scope of Work
Design, supply and installation of 225/30 kV transformer and high-voltage switchgear, control and protection systems, civil works, commissioning, and operator training for the Kerouane substation.
Why This Supplier Won
Contractor identity not named in the public Implementation Status Report. Initial contract value USD 10,560,000.00 with a subsequent price adjustment of USD 4,658,983.59 (+44.11 percent). Project is financed by IDA credits 62610 and D3360 under the Guinea-Mali Interconnection Project P166042.
Sectors
Energy
Power Transmission
Substations
Guinea
Ghana