CONTRACT AWARD ✓ Verified Updated 5 days ago

Construction of Siguiri 225/30 kV Substation, PIEGM

Engineering, supply and construction of the Siguiri 225/30 kV substation under the Guinea-Mali Electricity Interconnection Project (PIEGM), financed by IDA credits 62610 and D3360.

Key Information
Awarding Country
Awarded By
Electricite de Guinee (EDG)
Status
In Progress
Contract Value
EUR 7,899,722
Procurement Method
Open
Reference
P166042-WORKS-SUBSTATION-SIGUIRI
View Original Announcement Opens on the original publisher's site

Description

Works contract under the Guinea-Mali Interconnection Project (P166042). Scope covers design studies, civil works, supply and installation of high-voltage equipment including a 225/30 kV transformer, switchgear, control and protection systems, and commissioning of the Siguiri substation. The contract has two currency components: an initial value of EUR 6,299,169.60 plus GNF 18,756,169,819.18, and a subsequent price adjustment of EUR 1,600,552.82 representing 25.41 percent of the EUR component. As of 30 September 2024 the overall physical progress was 60.38 percent. Implementation has been delayed by late delivery of design studies and plans, by the contractor failing to renew an expired bank guarantee in time which prevented project payments, and by the suspension of works for nearly two months in July and August 2024 due to flooding from heavy seasonal rains. Following the lifting of the payment block, works resumed and the main electrical equipment, including the transformer, was scheduled for delivery in Conakry by 30 November 2024. The implementation schedule was revised and completion is now expected by 28 February 2025. Contractor name not disclosed in the public Implementation Status Report.

Scope of Work

Design studies, civil works, supply and installation of 225/30 kV transformer and high-voltage switchgear, control and protection systems, commissioning, and operator training for the Siguiri substation.

Why This Supplier Won

Contractor identity not named in the public Implementation Status Report. Contract has two currency components: initial EUR 6,299,169.60 plus GNF 18,756,169,819.18, with a subsequent price adjustment of EUR 1,600,552.82 (+25.41 percent on the EUR component). The award_amount field captures only the EUR component (initial plus adjustment) because the schema does not support multi-currency totals. The GNF component is documented in the description.

Sectors

Energy Power Transmission Substations

Source

World Bank Implementation Status and Results Report (ISR02057), Guinea-Mali Interconnection Project P166042, archived 14 November 2024

Related Contract Awards

Guinea

Trav réhab. de 39,811 km de pistes reliant les sites de RN1 Kouria-Taady Bondokhori, Carref (RN1) Koba-Koba, Wonkifong-Balaya, Carref Balaya-Digue Folon et Carrefour Balaya-RN4 à Coyah (Lot9 DAO)

USD 1,157,304
Guinea

Réhabilitation des locaux de la CRIEF

USD 1,174,284
Guinea

Travaux de réhabilitation de 39,80 km de pistes (route de désenclavement) reliant les sites de Kolia Sanamato-Thiéckèye, Mankountan- RN3 (Carrefour Toumbéta) et Hamdallaye-Yaguissiran (RN3) (Lot5)

USD 1,186,210
Guinea

RECRUTEMENT D’UN CONSULTANT (FIRME) POUR LE CONTROLE ET LA SUPERVISION DES TRAVAUX DE REHABILITATION DE 322,638 KM DE PISTES, DE CONSTRUCTION DE QUATRE (4) PONTS AINSI QUE DES INFRASTRUCTURES COMMUNA

USD 1,227,401