Procurement of Plant Design, Supply, Installation, test and Commissioning of transmission lines associated with substation of Injibara and Debark
Ethiopian Electric Power has issued a tender for procurement of Plant Design, Supply, Installation, test and Commissioning of transmission lines associated with substation of Injibara and Debark. It is published as a invitation for bids under the request for bids method. It applies to Ethiopia. It was published on 2026-10-12 and closes on 2026-11-26. The reference is ET-EEP-533125-CW-RFB. The notice was published by World Bank.
Read the noticeWe hold no submission or application link for this call, so this opens the published notice
Assess my chancesABA'AI reads this notice, then asks you only what we do not already hold
What this work usually goes forWhere we hold comparable contract awards for Invitation for Bids in Ethiopia: the spread, the awards behind it, and the measured reasons those figures run high. For most tenders the archive holds no like-for-like and says so in one line.
Keeps its status, your notes and a checklist on your tracker, and it can be shared with the people bidding with you.
Keeps it on your saved list, and its closing date on your deadline calendar. No status, no checklist and nobody else sees it.
Scope of Work
- The Ethiopian Electric Power (EEP) now invites sealed bids from eligible Bidders for Plant Design, Manufacture, Supply, Installation, test and, Commissioning of 230 kV Transmission line associated with the new Injibara and Debark substations. The works involves Plant Design, Supply, Construction, Test and Commissioning of about 85 km of a double circuit 230 kV, 3-phase Transmission Line, consisting of: the first 11 km constructed with quadruple circuit configuration towers and the remaining 74 km constructed with double circuit configuration, utilizing twin AAAC “ASH” conductors, single optical fiber cable shield wire on self-supporting, tapered configuration, vertical formation galvanized steel lattice towers, with each leg having separate footings of pad and chimney concrete type, from the existing Azezo Substation to the new Debark Substation and 30 km of a double circuit 230 kV, 3-phase, twin AAAC “ASH” conductor, single optical fiber cable shield wire on self-supporting, tapered configuration, vertical formation galvanized steel lattice towers with each leg having a separate footing of pad and chimney concrete type, from the existing Burie Substation to the Injibara new substation. The expected duration of the contract is 730 calendar days, plus 12 months of the Defect Liability Period. No margin of domestic preference shall apply, and bidders are required to meet the key qualification criteria, which include:
Requirements & Qualifications
The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet: (i) the following cash-flow requirements: USD 4.5 million, and (ii) the overall cash flow requirements for this contract and its current commitments
Original Procurement Notice
Read the notice as World Bank published itContact
NameTsion Berhanu
Emailtsionnaod@gmail.com