Construction of access road at owena dam multipurpose dam irrigation project, igbara oke, ONDO state
BENIN/ OWENA RBDA awarded a contract to SOOZ CREATION LTD for CONSTRUCTION OF ACCESS ROAD AT OWENA DAM MULTIPURPOSE DAM IRRIGATION PROJECT, IGBARA OKE, ONDO STATE. The procurement method is national competitive bidding. The contract value is NGN 31,941,779.39. The award was decided on 29 September 2018. The contract was signed on 30 October 2018. The reference is ocds-gyl66f-252038001-000001#award-1107. The notice was published by Nigeria Bureau of Public Procurement, NOCOPO.
Into French, Portuguese or Arabic, machine translated, with the original kept beside it.
Overview
ACCESS ROD CONSTRUCTION
Scope of Work
- Clear roadway (3m width) of all bush, scrub and vegetation including top soil and dispose on both sides of the road as directed by the Engineer's Representative. (quantity 9000)
- Grade roadway (6m width) to camber, shape and excavate for trapezoidal sides earth drains and turnouts in any materials except rock to any depth,dispose the surplus materials as directed by the Engineer. (quantity 18000)
- Excavate from approved borrow pits, haul excavated material any distance, deposit, spread in 150mm layers and compact to 100% W. A. Standard compaction as fillings for embankments, margins, capping, and road realignments including turnouts. Shape formation and trim slope to required cross section. (CBR = 40). (quantity 1080)
- Clearing of the Dam embankment of all weeds and shrubs (both downstream and upstream slopes). (quantity 2400)
- Uprooting of trees and overgrown shrubs on the Dam embankment slopes. (quantity 384)
- Clearing of the spillway discharge channel,removal of silt along the channel. (quantity 1)
- Bush clearing works at the command area for the CPIS. (quantity 1)
- Clear roadway (4m width) of all bush, scrub and vegetation including top soil and dispose as directed by the Engineer's Representative. (quantity 46000)
- Grade roadway (9m width) to camber, shape and excavate for trapezoidal sides earth drains and turnouts in any materials except to any depth, dispose the surplus materials as directed by the Engineer. (quantity 62415)
- Excavate from approved borrow pits, haul excavated material any distance, deposit, spread in 150mm layers and compact to 100% W. A. Standard compaction as fillings for embankments, margins, capping, and road realignments including turnouts. Shape formation and trim slope to required cross section. (CBR = 40), (Dam crest inclusive). (quantity 3375)
- Clearing of the Dam embankment of all weeds and shrubs (both downstream and upstream slopes). (quantity 13542)
- Uprooting of trees and overgrown shrubs on the Dam embankment slopes. (quantity 415)
- Clearing of the spillway discharge channel, removal of silt and stilling basin area (quantity 1)
Selection Criteria
ratedCriteria: As stated in the Advertisement