Construction of renewable energy/power supply upgrade for the headquarters development, Edo state
BENIN/ OWENA RBDA awarded a contract to SHARPEMANN LIMITED for CONSTRUCTION OF RENEWABLE ENERGY/POWER SUPPLY UPGRADE FOR THE HEADQUARTERS DEVELOPMENT, EDO STATE. The procurement method is national competitive bidding. The contract value is NGN 26,290,943.61. The award was decided on 29 October 2018. The contract was signed on 30 October 2018. The reference is ocds-gyl66f-252038001-000101#award-1258. The notice was published by Nigeria Bureau of Public Procurement, NOCOPO.
Into French, Portuguese or Arabic, machine translated, with the original kept beside it.
Scope of Work
- Clearing site and removal of topsoil not less then 150m depth over entire site area of all bush, grass, trees, remove roots, anthills and (quantity 1)
- Excavate, level and compact surface to 100% WAS compaction (quantity 1)
- Supply and install (DAMING PRODUCT) inverter off-Grid system: norminal power 120KW (150KVA) / Battery voltage 420Vdc / durable, stable / 380 / 400/ 415Vac three phase / 50Hz pure sine wave/ inflineon IGBT module (quantity 1)
- Supply and install DAMING solar charge controller - system with 6PV inputs LCD display various protection fuji / Mistsubish IGBT 420V 300A (quantity 3)
Selection Criteria
ratedCriteria: As stated in the Advertisement