Skip to the main content
CONTRACT AWARDUpdated 4 days ago

Tender for construction of a kitchen, an ablution block and a water reticulation system at kamanga secondary school (

Mulobezi Town Council awarded a contract to AILESS BANDA CONSTRUCTION AND GENERAL DEALERS for Tender for construction of a kitchen, an ablution block and a water reticulation system at kamanga secondary school (. The procurement method is limited. The contract value is ZMW 1,095,538.96. The award was decided on 18 May 2026. The reference is ocds-23g63a01-25357103#award-39418. The notice was published by Zambia Public Procurement Authority e-GP.

Into French, Portuguese or Arabic, machine translated, with the original kept beside it.
Key Information
Location
Zambia
Status
Awarded
Award Amount
ZMW 1,095,539
Reference
ocds-23g63a01-25357103#award-39418
Procurement Method
Limited
Language
English
Awarded to
AILESS BANDA CONSTRUCTION AND GENERAL DEALERS
Decision Date
May 18, 2026
Bidders
1

Overview

Tender for construction of a kitchen, an ablution block and a water reticulation system at kamanga secondary school

Scope of Work

  • Bulk storage (UNSPSC 78131700)

Selection Criteria

lowestCost: BEST EVALUATED BIDDER

Similar contract awards

View all